The vessel will be the shipyard’s build no. 73, and will have the design designation SC-51. The design is adapted from the shipowners operating based on white fish, and now also in combination with stun and bleed-line for salmon and trout, for the aquaculture industry.
The new vessel will be equipped with RSW cooling and a factory line for processing the fresh fish, and the shipowners have been environmentally aware and focused on the climate footprint in the design process. They have chosen the newest technology available for this type of vessel with an optimized hull, propeller with nozzle, two steps gear, variable speed generator, “take me home” solution, and a battery pack with approx. 1,5 Mwh.